frame off!

Stu and Dustin got the shell off and then cleaned off the frame. The condition was quite rough so now it’s off to a welding shop to get it repaired. Before Stu dropped it off, they cut the plywood for the subfloor. We visited a flooring shop today to start to get a design palette together for the overall look. The frame repair should take about two weeks. A little progress day by day!  


Choices, choices!


Comments

Popular posts from this blog

a shell of what it once was

La Paz

Thanksgiving at The Range