Posts

Showing posts from March, 2023

frame off!

​ Stu and Dustin got the shell off and then cleaned off the frame. The condition was quite rough so now it’s off to a welding shop to get it repaired. Before Stu dropped it off, they cut the plywood for the subfloor.  We visited a flooring shop today to start to get a design palette together for the overall look. The frame repair should take about two weeks. A little progress day by day!   Choices, choices!